Overview
Configured for direct power distribution between Honeywell Safety Manager system components, the Honeywell FS-PDC-IOR05 (FS-PDC-IOR05 Power Distribution Cable) provides a defined cable and connector assembly for physical electrical interconnection.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | FS-PDC-IOR05 |
| Brand | Honeywell |
| Product Type | Power Distribution Cable |
| Cable Type | SAB 2040707 |
| Cable Specification | CC600 7 x 0.75 mm2 |
| Cable Length | 2.45 m |
| Connector Type | 8 pole, pin header |
| Weidmuller Connector | BLC 5.08/8 BR |
| Weidmuller Pins | DFFC 0.5 – 1.0 SN E |
| Approvals | UL, CSA |
| Tariff Code | 8537101190 |
| Origin | USA |
| Weight | 0.56 kg |
| Dimensions | Estimated shipping size: 2 x 24 x 26 cm |
| Electrical Function | Power distribution and physical interconnection |
Honeywell Safety Manager Power Distribution Interface
The FS-PDC-IOR05 uses a SAB 2040707 cable construction with seven conductors, each specified as 0.75 mm2. The 2.45 m cable length defines the physical connection distance within the applicable installation.
The cable terminates through an 8 pole pin-header arrangement. The specified Weidmuller BLC 5.08/8 BR connector and DFFC 0.5 – 1.0 SN E pins define the termination hardware.
Because the supplied data does not specify voltage, current rating, pin assignment, shielding, or connector mating orientation, those values should be verified against the applicable Honeywell system documentation before installation.
Frequently Asked Questions
Q: What cable type does the FS-PDC-IOR05 use?
A: The specified cable type is SAB 2040707, with a CC600 7 x 0.75 mm2 construction and a length of 2.45 m.
Q: What connector does the FS-PDC-IOR05 use?
A: The assembly uses an 8 pole pin-header configuration with a Weidmuller BLC 5.08/8 BR connector and DFFC 0.5 – 1.0 SN E pins.
Q: Does the FS-PDC-IOR05 have a specified power consumption?
A: No. The supplied data identifies it as a passive Power Distribution Cable, so no power-consumption value is specified.
Field Installation Guidelines
- Confirm the FS-PDC-IOR05 model and cable length before installation.
- Verify the mating connector against the specified Weidmuller BLC 5.08/8 BR interface.
- Check each connector for bent, displaced, or contaminated contacts before mating.
- Route the cable without excessive bending, pulling, or mechanical tension.
- Keep the cable separated from sources of mechanical damage and unsuitable electrical interference.
- Verify the system wiring diagram and pin assignment before energizing the connected equipment.
- Do not assign voltage or current limits that are not stated in the applicable Honeywell documentation.
- After installation, inspect the connector engagement and cable routing before system power-up.


















Reviews
There are no reviews yet.