Overview
Configured for 5 VDC power distribution in the IOCHAS-0003S assembly, the Honeywell FS-PDC-IOS05A (FS-PDC-IOS05A power distribution cable) provides a defined physical connection between the chassis power distribution point and the associated I/O hardware.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | FS-PDC-IOS05A |
| Product Type | Power Distribution Cable |
| Brand | Honeywell |
| Origin | USA |
| Weight | 0.4 kg |
| Dimensions | 24 x 18.8 x 6.5 cm estimated shipping size |
| System Application | IOCHAS-0003S |
| Cable Type | SAB 2040415 |
| Cable Construction | CC600, 4 x 1.5 mm2 |
| Cable Length | 2.45 m |
| Connector Type | 8 pole, pin header |
| Connector | Weidmuller BLZP 5.08HC/08/180F SN BK |
| Approvals | UL, CSA |
| Tariff Code | 8537101190 |
Power Distribution and Connection Characteristics
The FS-PDC-IOS05A uses a 4 x 1.5 mm2 CC600 cable with a 2.45 m overall length. The assembly terminates through an 8 pole pin-header connection. The supplied connector specification identifies the Weidmuller BLZP 5.08HC/08/180F SN BK component.
The cable serves the 5 VDC power-distribution path associated with the IOCHAS-0003S chassis. Therefore, installation should preserve conductor identification, connector orientation, and the original cable routing. The supplied data does not specify individual pin assignments or allowable current per conductor, so these values should be verified against the applicable Honeywell wiring documentation before energization.
Frequently Asked Questions
Q: What system is the FS-PDC-IOS05A associated with?
A: The supplied specification identifies the cable for 5 VDC power distribution in the IOCHAS-0003S assembly.
Q: What cable and connector configuration does the FS-PDC-IOS05A use?
A: It uses a SAB 2040415 cable, CC600 4 x 1.5 mm2 construction, 2.45 m length, and an 8 pole pin-header connection with a Weidmuller BLZP 5.08HC/08/180F SN BK connector.
Q: What operating temperature and current rating does the cable have?
A: The supplied data does not specify these values. Use the applicable Honeywell technical documentation to verify them before installation.
Field Installation Guidelines
- Confirm the FS-PDC-IOS05A model and cable identification before installation.
- Inspect the 8 pole pin-header and mating connector for bent, contaminated, or damaged contacts.
- Maintain the specified connector orientation during mating.
- Route the 2.45 m cable without excessive bending, crushing, or mechanical tension.
- Keep the cable separated from sources of electromagnetic interference where the original installation requires separation.
- Preserve the original conductor arrangement and do not change pin assignments without verified Honeywell wiring documentation.
- Verify the 5 VDC distribution circuit and associated chassis connections before applying power.
- Confirm UL and CSA approval requirements against the installation environment and applicable system documentation.
















Reviews
There are no reviews yet.