Overview
The Honeywell TK-CCR013, also identified by the base model TK-CCR013, is described in the supplied information as a communication interface module associated with Honeywell Experion Process Knowledge System (PKS) platforms. Its specific network protocol, electrical interface, and supported hardware configuration have not been verified. Confirm the exact part number and system compatibility before installation.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | TK-CCR013 |
| Brand | Honeywell |
| Product Series | Experion PKS |
| Module Type | Communication Interface Module; provisional classification |
| Diagnostic Indicators | Reported in supplied description; exact LED functions unverified |
DCS Communication and Interface Verification
The supplied description associates the TK-CCR013 with Honeywell Experion PKS network infrastructure. However, the exact module function and compatibility with Series C chassis, controller assemblies, or network interfaces require confirmation against manufacturer documentation.
Before integrating this component into a DCS network, verify the following parameters:
- Network protocol: Confirm the supported communication standard, port type, and data transmission rate.
- Hardware compatibility: Check the approved chassis, termination assemblies, and controller configuration.
- Electrical requirements: Obtain the specified supply voltage, current consumption, and connector pin assignments.
- Diagnostics: Confirm the meanings of front-panel indicators using the applicable hardware manual.
Do not assume that the module supports 4-20 mA HART, FOUNDATION Fieldbus, or PROFIBUS PA. These are distinct interface technologies, and the supplied information does not establish support for any of them.
Frequently Asked Questions (FAQ)
Q: Is the Honeywell TK-CCR013 compatible with Experion PKS Series C hardware?
A: The supplied description suggests an association with Experion PKS, but it does not establish compatibility with a specific Series C chassis or controller. Verify the full part number and approved hardware configuration before installation.
Q: What power supply does the TK-CCR013 require?
A: The operating voltage and current consumption are not provided. Refer to the manufacturer’s technical documentation for the electrical ratings and applicable power distribution requirements.
Q: Does the TK-CCR013 support hot-swapping?
A: Hot-swap capability has not been verified. Check the relevant system maintenance documentation before removing or inserting the module while the system is energized.
Field Installation Guidelines
- Confirm the complete model number and hardware revision against the system bill of materials.
- Verify the designated mounting location, connector arrangement, and electrical supply requirements.
- Inspect connectors and mating interfaces for contamination, bent contacts, or mechanical damage.
- Route communication cables separately from high-voltage and high-current wiring where practical.
- Apply cable shielding and grounding according to the manufacturer’s installation instructions and the site’s grounding design.
- Confirm module recognition, diagnostic status, and network communication through the approved system maintenance tools.
- Do not energize the assembly until the required electrical ratings and installation configuration have been verified.
















Reviews
There are no reviews yet.