Overview
Suffix Breakdown & Model Matrix
| Code Element | Definition |
|---|---|
| ANB10D | Node Unit for Dual-Redundant ESB Bus (FIO Architecture) |
| -4 | Dual-redundant power supply configuration |
| 1 | 100 – 120 V AC power input |
| 0 | Basic type, no explosion protection |
| /S2 | Style code 2 (hardware revision/generation) |
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model Brand | Yokogawa ANB10D-410/S2 |
| Origin | Singapore |
| Weight | 10 kg (fully loaded with 8 FIO modules) |
| Dimensions | 482.6 mm width x 4U/5U height (19-inch rack mount) |
| Operating Temp | 0 to 60 degC |
| Power Consumption | 200 VA, 120 W |
| Power Supply Voltage | 100 to 120 V AC (47 to 63 Hz) |
| Voltage Fluctuation Range | 90 to 132 V AC |
| I/O Capacity | 8 FIO module slots, 2 ESB bus interface slots |
Channel-to-Channel Isolation Characteristics
The ANB10D-410/S2 implements channel-to-channel isolation across FIO interfaces to prevent ground loop formation and minimize crosstalk between analog and digital signal paths. Backplane isolation is maintained at rated dielectric strength to ensure signal integrity under high electromagnetic interference conditions typical of process plant environments.
Frequently Asked Questions
Q: Does the ANB10D support hot-swapping of FIO modules?
A: FIO modules may be replaced under power in redundant configurations; however, ESB bus interface modules must not be removed while the node is operational.
Q: What is the switching behavior during loss of one power supply in dual-redundant mode?
A: The remaining power supply assumes full load automatically without interruption to bus communication or I/O operation.
Q: Is firmware compatibility dependent on the style code?
A: Yes, the /S2 style code defines hardware revision levels that correspond to specific firmware versions supported by the CENTUM VP system engineering tools.
Field Installation Guidelines
Mount the unit in a standard 19-inch rack using secure bracket fixation. Maintain minimum spacing above and below the chassis for ventilation to avoid thermal accumulation beyond 60 degC ambient limits. Use shielded twisted-pair cabling for ESB bus connections with shield termination at the node chassis ground point. Ensure AC power wiring complies with local electrical codes and is isolated from high-voltage equipment feeders to reduce conducted noise. Verify torque specifications on power terminal blocks prior to energizing the node.
Emerson Top Products
| Emerson DeltaV | Epro | Ovation/Westinghouse |
| KJ1501X1-BC3 | 9100-00049-03 | 1C31122G01 |
| KJ3202X1-BA1 | A6110 | 1C31125G03 |
| KJ3222X1-BA1 | A6120 | 1C31232G01 |
| KJ3243X1-BA1 | A6125 | 1C31147G01 |
| KJ3002X1-BG1 | A6140 | 1B30035H01 |
| KJ3002X1-BB1 | A6210 | 1B30023H02 |
| KJ3001X1-BB1 | A6220 | 1B30023H01 |
| KJ3002X1-BC1 | A6312 | 1C31132G01 |
| KJ3002X1-BF1 | A6312/06 | 1C31129G03 |
| KJ3001X1-BJ1 | A6312/08 | 5X00119G01 |
Customers Also Viewed
| Bently Nevada | ABB | Yokogawa | Woodward | Schneider |
| 133835-02 | SPDSM04 | CP451-10 | 5463-785 | 140CPU65150 |
| 135321-01 | SPIEET800 | CP461 | 5437-672 | BMEXBP0400 |
| 135322-01 | SPINIET800 | CP461-50 | 9907-175 | 140CPU67160 |
| 136751-01 | SPNLK01 | CP451-11 | 5466-355 | 170FNT11001 |
| 136751-02 | SPSED01 | CP701 S1 | 5466-257 | 170ADO34000 |
| 184139-10 | SPSEM11 | CP345 S1 | 5466-1049 | 170ADM35010 |
| 82362-01 | SPSET01 | SCP461-11 S1 | 5501-381 | 170ADI34000 |
| 84134-01 | SPTKM01 | CP451-10 S2 | 8200-177 | 140ARI03010 |
| 87900-02 | SPTPS02 | CP401-10 | 8200-205 | BMXCPS4002 |
| 89998-01 | SPTPS13 | NFCP100-S00 | 9907-029 | 140CRP93200 |
















Reviews
There are no reviews yet.